Commercial Signage
Commercial signage, end to end.
A single partner for exterior identity, interior wayfinding, LED, and architectural signage — built for businesses that take their brand seriously.

Overview
What we deliver
CityNeon designs, engineers, fabricates, and installs commercial signage for businesses across the United States. Every project ships through one team — no handoffs between vendor, fabricator, and installer.
We work directly with owners, architects, GCs, and brand teams to deliver signage that holds up structurally, photometrically, and visually for the long term.
Use cases
Where it's deployed
Materials & capabilities
What we fabricate
Channel Letters
Front-lit, halo-lit, push-through acrylic with UL-listed LED systems.
Monument & Pylon
Ground- and pole-mounted identity engineered to local wind codes.
Lobby & Interior
Dimensional metal, backlit logos, ADA-compliant wayfinding.
LED & Digital
EMC displays, programmable LED arrays, integrated controls.
Architectural Signage
Custom one-off fabrications integrated into the building envelope.
Service & Maintenance
LED retrofits, face replacement, structural repair, scheduled service.
Process
From brief to install
Site survey, brand review, code research, scope definition.
Renderings, stamped structural drawings, permit-ready submittals.
In-house metal, acrylic, and LED assembly with QC at every stage.
Certified install crews, commissioning, warranty, and ongoing service.
FAQ
Questions, answered
What counts as commercial signage?
Any exterior or interior sign serving a business: channel letters, monuments, pylons, lobby signs, wayfinding, LED displays, and architectural identity systems.
Do you handle permits and code compliance?
Yes. We manage permit research, stamped drawings, variance support, and inspection coordination in every jurisdiction we serve.
Can you handle multi-location rollouts?
Yes — we run programmatic rollouts for franchise and multi-location brands with a single PM and consistent spec control.
What is your typical project timeline?
Most commercial programs run 6–12 weeks from approved design through install, with permit timing driving the critical path.
Related services
Keep exploring
Next step
Bring us your project.
Send drawings, photos, or a rough brief. We'll respond with a scoped path forward — typically within one business day.